OVERVIEW
The project had strict schedules which meant that minimal disruption to the surrounding areas was essential. A waterproofing system was required that would meet the requirements from both the public and private sectors as well as provide a contemporary, aesthetically pleasing finish.
Single Component Cold Applied Liquid System for Warm Roofs - IKO Hybritech 1K PU - Waterproofing system
1,000m2 Ecological, Air Purifying Roofing Refurbishment for a Library
A Cladding Refurbishment Project with Specific Colouring Requirements
A Flame-Free Solution to Reduce the Potential Fire Risk
A Natural and Locally Sourced Construction Required an Anti–Root Roofing System
Fleming Park Leisure Centre
Barton Hill Academy
Blackfordby St Margaret’s Primary School
Beckfoot Allerton Primary School