NBS Source
I'm a manufacturer

Porous, all weather car park surface for large brewery

OVERVIEW

A new 4,000m2 staff car park was required for this large brewery in Monmouthshire. Sustainable water management was a key priority for the client. As a result they had specified full infiltration porous construction that would allow rainwater to soak into the pavement, before being slowly released into the ground. This would help to reduce the rapid runoff which can cause local drainage systems to be overloaded after heavy rainfall.


The new ULTIPOROUS surface provided a safe, all-weather parking area which would avoid surface water after heavy rainfall and formation of ice during the winter. It also met the client’s sustainability requirements by helping to manage rainwater at source and control its release into the surrounding environment.

Products featured in this case study

View all products (24)
ULTIPOROUS - Porous Asphalt

ULTIPOROUS - Porous Asphalt

More case studies from Tarmac

View all case studies (49)
Tarmac Ultifastpave car park surface

Tarmac Ultifastpave car park surface

Tarmac Ulticolour - coloured asphalt for tourist venue

Tarmac Ulticolour - coloured asphalt for tourist venue

Ulticolour asphalt Modern Housing Develeopment, Salford

Ulticolour asphalt Modern Housing Develeopment, Salford

Ulticolour coloured asphalt, busy tourist develeopment

Ulticolour coloured asphalt, busy tourist develeopment

More case studies from Porous asphalt concrete (PAC) surface courses

View all case studies (7)
Porous, fast draining car park surface for college campus

Porous, fast draining car park surface for college campus

Heavy duty and porous asphalts for business park

Heavy duty and porous asphalts for business park

Porous asphalt surfacing for car dealership

Porous asphalt surfacing for car dealership

Porous asphalt adopted road for new housing development

Porous asphalt adopted road for new housing development