Starboard Hotels and Maith Architects invited Licata Building Systems and Licata contracting partner Build-Therm Services Limited to assist with the redevelopment of the previous Park Royal bar to provide a 162-bedroom Hampton by Hilton hotel. The original building, lying vacant and in a state of disrepair, has a listed Art Deco façade, which has been retained and refurbished to its former glory, with the new hotel being built in behind and wrapped over with new, substantially glazed floors and Licata FireSafe Brick Slip system.
Completed in 2018, the system comprised of 160mm high density mineral fibre, comfortably achieving the target U Value of 0.04W/mK. The brick slips were selected and cut from handformed clay to match the original building.
No featured products in this case study
Contact Licata Building Systems Ltd by clicking the button below to find out which
products were used in this case study.