OVERVIEW
Location: Manchester, UK
The gym and swimming pool areas of Property Alliance Group’s Oxygen development required works to start before the tower cranes had been removed and ahead of the building being made watertight – ideal conditions for a mould-resistant, quick-to-install product like Specwall which can be installed in all weather conditions.
Using a blockwork alternative would have required a large amount of scaffolding on the 6.2m high walls and doubled the installation period. Using Specwall eliminated this issue and provided significant programme savings for the client.
Hybrid Specwall HB003 (Acoustic & fire rated wall panel systems for internal separating walls) - Lightweight Concrete Panel
Hybrid Specwall HB004 (Acoustic & fire rated wall panel systems for internal separating walls) - Lightweight Concrete Panel
Hybrid Specwall HB008 (Acoustic & fire rated wall panel systems for internal separating walls) - Lightweight Concrete Panel
Single 100 mm Specwall (SFS, Blockwork Alternative For Shaft, Risers, External And Internal Walls) - Lightweight Single Concrete Panel
Twin 100mm Specwall (Strong, Durable, Mould resistant Masonry Fire partition walls) - Insulated Twin Concrete Panel
Hybrid Specwall HB001 (Acoustic & fire rated wall panel systems for internal separating walls) - Lightweight Concrete Panel
Hybrid Specwall HB002 (Acoustic & fire rated wall panel systems for internal separating walls) - Lightweight Concrete Panel
Single 75 mm Specwall (SFS, Blockwork Alternative For Shaft, Risers, Internal Walls) - Lightweight Single Concrete Panel
Lucent
Beechwood Avenue
The Crescent
The Ciel Tower
Lucent
The Crescent
The Ciel Tower
The Opus