Northern General Hospital Helipad

by ThermoSphere

  Favourite

The project was for the construction of a heated helipad at Sheffield‘s Northern General Hospital. The scheme included a dedicated heated access ramp leading down to the A&E entrance. We put together a specification for heating the main helipad and the ramp. Heating was required to prevent ice and snow forming which would inhibit the team from safely transporting patients to the hospital. We designed a solution which involved using a 3 phase 400V system with an output of 300W/M2. The system was designed in 3/4 sections to ensure the load did not exceed the supply.