OVERVIEW

Client: Minster in Sheppey Primary School – Nursery, Lower, and Upper Sites

 

Product: Covora Lite Low Surface Temperature (LST) Radiators

 

Challenges: Competitive specification, phased delivery, design changes during development

 

Solution: Covora Lite LSTs matched to heat output requirements, with revised quotations throughout

 

Outcome: Efficient, phased delivery across three school buildings; customer satisfaction achieved

Background

Minster in Sheppey Primary School, located in Kent, is a large education facility made up of three separate buildings - nursery, lower school, and upper school. As part of a site-wide heating upgrade, a contractor was appointed to manage the mechanical installation across all phases.

 

Although the M&E consultant had originally specified a competitor product, the customer approached Contour to provide a like-for-like alternative. Contour had previously quoted for similar works but had not been successful on earlier tenders. This time, however, the Covora Lite LST range was selected to deliver the required outputs while meeting the school’s performance and budget expectations.

 

The Challenges

The project came with several logistical and specification-related challenges that needed to be addressed throughout the programme:

 

1. Competing Specification 

 A competitor product had been specified by the consultant, requiring Contour to carefully match the required outputs and demonstrate suitability through an alternative proposal. 

2. Phased Development 

The works were carried out in three distinct phases; first the lower school, then the upper school, followed by the nursery. Radiators needed to be supplied in alignment with the site programme.

3. Design Revisions 

As the project progressed, the M&E consultant issued multiple design changes, meaning several revisions to radiator quantities, sizing, and specification were required. 

Solution Implemented

Contour worked collaboratively with the contractor to supply a reliable and compliant solution:

 

  • 48 Covora Lite LST radiators were supplied for the upper school

  • 67 units were provided for the lower school

  • 10 units were installed in the nursery

  • Additional panel radiators were also supplied as part of the full package

 

All units were carefully specified to match required heat outputs and suit the different building layouts. The Covora Lite range was selected for its cost-effectiveness, safety features, and suitability for education environments. As a supply-only project, Contour ensured the contractor received clear documentation and responsive support throughout the procurement and delivery process.

Outcome

Despite multiple design changes and a phased delivery schedule, the project was completed on time and to the client’s satisfaction. The Covora Lite units provided a dependable and safe heating solution for each part of the school, supporting comfort, efficiency, and long-term performance.

 

Contour’s flexibility in managing revisions, along with their responsive service and reliable product supply, helped contribute to a smooth and successful installation for all three buildings on site.

Products featured in this case study

View all products (16)
Covora Lite LST Radiator

Covora Lite LST Radiator

More inspiration from CONTOUR HEATING PRODUCTS LIMITED

View inspiration
Mid Cheshire Hospitals NHS Foundation Trust

Mid Cheshire Hospitals NHS Foundation Trust

Anti-Ligature Covers For A Mental Health Trust In Southeast England

Anti-Ligature Covers For A Mental Health Trust In Southeast England

Care Home In The South Of England

Care Home In The South Of England

Early Years Centre - Bromsgrove

Early Years Centre - Bromsgrove

More inspiration from Radiators

View inspiration
Skejby Psychiatry Centre

Skejby Psychiatry Centre

New Sct. Hans Forensic Psychiatric Hospital

New Sct. Hans Forensic Psychiatric Hospital

Steno Diabetes Center, Copenhagen

Steno Diabetes Center, Copenhagen

Our Contribution to Cwmglas Primary School Retrofit Project

Our Contribution to Cwmglas Primary School Retrofit Project