NBS Source
I'm a manufacturer

Metro Centre

OVERVIEW

The Metro Centre is over 22 years old and the building had been experiencing leaks, a problem which was exacerbated by the numerous changes in plant installations on the roof. The original felt waterproofing had reached the end of its working life and a system was required that would keep the building watertight, help comply with current building regulations, and bring the insulation standards up to Part L. A Cold Bonded Built-Up Roofing System was specified for the project consisting of 40mm Decotherm insulation, a Carrier Membrane, and a seamless Decothane Gamma 20 waterproof ‘cap sheet’.

No featured products in this case study

Contact Sika Liquid Plastics by clicking the button below to find out which products were used in this case study.

More case studies from Sika Liquid Plastics

View all case studies (7)
Media City UK

Media City UK

SIKA PROVIDES IDEAL SERVICE FOR UNIVERSITY CHAPLAINCY

SIKA PROVIDES IDEAL SERVICE FOR UNIVERSITY CHAPLAINCY

SIKALASTIC PROVIDES RAPID CURE FOR SOCIAL HOUSING RESIDENTS IN NORWICH

SIKALASTIC PROVIDES RAPID CURE FOR SOCIAL HOUSING RESIDENTS IN NORWICH

LIGHTS, CAMERA, ACTION TO OVERLAY THE ROOF AT PINEWOOD STUDIO

LIGHTS, CAMERA, ACTION TO OVERLAY THE ROOF AT PINEWOOD STUDIO