You are viewing content for United Kingdom.
Choose a country to see content for your location. Changing region will navigate you to the homepage.
OVERVIEW
Over the past two years, Fastline Steel Services has been proud to play a key role in one of the UK’s largest and most significant energy infrastructure projects. Working closely with the client, we have manufactured and supplied over 2,000 m of high-security perimeter fencing, along with multiple pedestrian and vehicular gates and fully automated sliding cantilever gates.
This isn’t just any project. Once operational, the site will have a generating capacity of 2.9 GW, enough clean energy to power more than 3 million UK homes. It’s projected to contribute up to £8.5 billion to the local, national, and global economy through supply chain investment and the creation of thousands of high-skilled jobs, both during construction and throughout its operational life.
Key Features:
The specialist palisade system was selected for its strength, reliability and proven long-term performance in securing critical national infrastructure.
This project stands as a testament to Fastline’s ability to deliver large-scale, high-security perimeter systems that support the UK’s drive toward a sustainable energy future.
Contact Fastline Steel Services UK Ltd by clicking the button below to find out which products were used in this case study.
Securing a Premier League Football Team's Training Ground with Fastmesh-SPX
Enhancing Security and Aesthetics with a Custom Gate Installation
Strengthening Security with Fast-Tech SR1-Rated Cantilever Gates For Home Bargains
Securing an Amazon Distribution Centre with Imperium-2-358DB SR2