One of the most common causes of green roofs under performing is insufficient application of irrigation immediately after the plants have been installed. With the UK’s variable weather conditions we can experience long periods of unseasonably dry weather when normal levels of rainfall cannot be relied upon to provide sufficient moisture for the plants to establish into the growing medium.
Contact Alumasc Roofing by clicking the button below to find out which products were used in this case study.
Hydrotech MM6125 hot mely waterproofing independently verified by underwriters laboratories - 30% recycled content.
The benefits of Alumasc's BluRoof single point warranty
Alumasc look back at their first blue roof installation from over 3 years ago - University of Bristol Lecture Theatre
30-year old plus flat roofs still going strong