NBS Source
I'm a manufacturer

Lorraine Road

OVERVIEW

TRC been appointed by Milestone Contracting to survey, remove, manufacture, install and replace over 200 spring balance sash windows at Lorraine road in London.

Engineered to a high standard, spring sash windows exude quality and style.


Modern spring sash windows operate in a smooth and seamless manner. By replacing the original cord with a spring-loaded mechanism, the windows are much easier to slim down. This enables sections of the frame to need less room for housing the extra reveal space (where the heavy weights and pulleys were once placed). This modern solution has become ideal for housing slimline window cavities.

The windows installed had to comply with the following spec requirements:

  • Windows to meet PAS24 enhanced security level
  • The whole window U value to meet 1.4 w/m²K.
  • FSC certified Hardwood timber.



Products featured in this case study

View all products (36)
Traditional Spring Sash Windows - Double

Traditional Spring Sash Windows - Double

Traditional Spring Sash Windows - Single

Traditional Spring Sash Windows - Single

Traditional Spring Sash Windows - Triple

Traditional Spring Sash Windows - Triple

More case studies from TRC Windows

View all case studies (31)
University Arms Hotel, Cambridge

University Arms Hotel, Cambridge

35 Old Queen Street

35 Old Queen Street

The Star and Garter, London

The Star and Garter, London

Mayfair House

Mayfair House

More case studies from Wood window units

View all case studies (50)
Bolsover Model Village

Bolsover Model Village

University Arms Hotel

University Arms Hotel

Vauxhall Primary School

Vauxhall Primary School

Douay Martyrs Catholic School

Douay Martyrs Catholic School