Long Term Solution for Troublesome A55 Manhole Covers

OVERVIEW

IKO approved contractor and highway repair specialist, RAB Associates (UK) Ltd, removed the cast iron cover and frames, and removed residual material such as loosened brickwork. The surrounding distressed road surfacing was also removed. Then, using IKO Permatrack Compounds, the re-bedding to match adjacent levels of the previous items was quickly completed. The repair was finished using IKO Permatrack and pre-coated high PSV chippings to fill the surrounding void to match the existing road levels.

No featured products in this case study

Contact IKO PLC by clicking the button below to find out which products were used in this case study.

More case studies from IKO PLC

View all case studies (88)
Essential Roofing Works Carried Out For Sewage Treatment Works

Essential Roofing Works Carried Out For Sewage Treatment Works

1,000m2 Ecological, Air Purifying Roofing Refurbishment for a Library

1,000m2 Ecological, Air Purifying Roofing Refurbishment for a Library

Manhole Reinstatement - IKO Pacopatch, Market Harborough

Manhole Reinstatement - IKO Pacopatch, Market Harborough

IKO Polimar CRS used for Trimpley Water Treatment

IKO Polimar CRS used for Trimpley Water Treatment