NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

London Power Tunnels - Concrete for Tunnelling

OVERVIEW

Following a successful first phase in 2018, London Power Tunnels 2 (LPT2) is a project to ‘rewire’ south London. The six-year, £1bn scheme will comprise the construction of 32.5km of 3m-diameter tunnels built deep below the road network between Wimbledon and Crayford to carry high voltage electricity cables.

A Hochtief-Murphy Joint Venture (HMJV) was awarded the contract in December 2019 to design and construct the tunnels & shafts and install the EHV (extra-high volume) cable brackets. The New Cross site is one of several in the overall scheme.

No featured products in this case study

Contact Sika Limited by clicking the button below to find out which products were used in this case study.

More case studies from Sika Limited

View all case studies (44)
Twickenham Stadium Resin Flooring

Twickenham Stadium Resin Flooring

THE CUNARD BUILDING

THE CUNARD BUILDING

Merry Hill Retail Complex Car Parks

Merry Hill Retail Complex Car Parks

Christ Church URC, Chelmsford

Christ Church URC, Chelmsford