The Landmark London Development stands as a cutting-edge office building in the heart of the City of London, serving as the European headquarters for an international financial organisation. It seamlessly integrates facilities while maintaining architectural elegance.


Background

Landmark London Development is a state-of-the-art office building in the heart of the City of London working as

the new European Headquarters for an international financial organisation. The 10-storey office building was the largest fitout in 2019, housing up to 6000 members of staff with more than one million square feet of space. What’s more, this unique building offers a variety of amenities to its users, including auditorium and conference centre, Health centre, a nursery and playcentre, a fully equipped gym, therapy rooms for sports massages and resting rooms.


Challenge

Due to the large scale of this project, the client needed to secure several entrances to the building, including the main reception, a gym and childcare centre, a cycle parking entrance and a contractors entrance. While preventing unauthorised access to the building was crucial, the solution needed to complement the architectural intent and provide the smooth flow of authorised users passing through the prestigious building.


Solution

Meesons worked closely with the project team for over five years, including trialling demonstration units at one of the existing offices. After thoroughly analysing what was needed, 17 lanes of EasyGate Elite dual wing speed gates were opted for across the two main entrances to facilitate a high number of daily transits.


The design of the Elite Speed Gates with stainless steel construction and slim cabinet made this the ideal solution in terms of aesthetics. At the clients request, the ability to override the speed gates to enable free passage of VIP guests was implemented with the integration of remote key fobs provided to the onsite concierge security As well as this Forty-eight biometric towers were installed to provide a consistent look across the different entrances, each supplied with QR readers as an alternative method of authentication.


To secure the cycle parking entrance, Meesons provided the perfect solution that is the FPJ140 2HP Bike Portal. It has a spacious design to ensure a comfortable transit for bike users that accommodates to people with or without a bike, ensuring only those authorised can gain access to the cycle parking. To cope with the high numbers of staff using the cycle parking area, 3 Bike Portals were installs, along with surrounding glazed infill to create a secure line.

Products featured in this case study

View all products (10)
EasyGate Elite Speed Gate

EasyGate Elite Speed Gate

More inspiration from Meesons A I Ltd

View inspiration
PureGym, Nationwide

PureGym, Nationwide

Savill Garden, Windsor

Savill Garden, Windsor

2 London Wall Place, London

2 London Wall Place, London

40 Bank Street, London

40 Bank Street, London

More inspiration from Half-height access control gates

View inspiration
DEMAND FOR INCREASED SECURITY IN MULTI TENANTED BUILDINGS - Automatic Systems - International

DEMAND FOR INCREASED SECURITY IN MULTI TENANTED BUILDINGS - Automatic Systems - International

Secure your data centre by installing access control equipment - access control, turnstile, speed gate, barrier Automatic Systems

Secure your data centre by installing access control equipment - access control, turnstile, speed gate, barrier Automatic Systems

A PRACTICAL GUIDE TO ACCESS CONTROL EQUIPMENT FOR EDUCATION CAMPUS’S - Automatic Systems - International

A PRACTICAL GUIDE TO ACCESS CONTROL EQUIPMENT FOR EDUCATION CAMPUS’S - Automatic Systems - International

Two Hardman Street, Manchester

Two Hardman Street, Manchester