NBS Source
I'm a manufacturer

This case study is no longer available.

Lakefield School

OVERVIEW

Procter were employed by TRJ to supply and install various types of fencing and gates to Lakefield School site in Llanelli. The site required 2.4m high Secured By Design (SBD) fencing and 1.2m high above a new built brick wall on dog leg posts to the perimeter.

No featured products in this case study

Contact Procter Contracts by clicking the button below to find out which products were used in this case study.