The Korea Expressway Corporation runs the toll roads in South Korea and actively engages in the construction and maintenance of national expressways. In 2013 underfloor air conditioning equipment was installed over nineteen floors of the new headquarters tower, over an area of approximately 24,000 sq m. A total of 38 large size CAM-V downflow units supply air at volumes of up to 16,500 m3/hour.
Contact AET Flexible Space by clicking the button below to find out which products were used in this case study.
180 Great Portland Street, London
Battersea Studios 2, London
Manchester Civil Justice Centre
One Cavendish Place, London