NBS Source
I'm a manufacturer

Islington Waste Recycling Centre

OVERVIEW

The Islington Waste Recycling Centre is looking to decarbonise. At present, the centre accounts for 9% of Islington Council’s corporate estate gas use and the aim is to reduce that to zero. To achieve this, air source heat pumps and condenser units will be installed which posed an immediate challenge – how to install new copper pipework without disrupting the recycling centre. Contractor Vital Energi’s solution focused on the use of Viega Profipress.

No featured products in this case study

Contact VIEGA LTD by clicking the button below to find out which products were used in this case study.

More inspiration from VIEGA LTD

View inspiration
Royal Warwick Square

Royal Warwick Square

The Londoner Hotel

The Londoner Hotel

University of Essex

University of Essex

Tollgate Gardens

Tollgate Gardens