by IKO PLC
The IKO Cladding Refurbishment System (CRS) was chosen, extending the life expectancy of the roofs with a 10 year guarantee from IKO PLC. The existing coating was de-bonding from the plastisol sheets with bare metal showing in places, signs of water damage prior to rusting. Sections of ridge flashings had worked their way loose and were missing from several locations on three of the roofs
Contact IKO PLC by clicking the button below to find out which products were used in this case study.
Portslade Academy - IKO Ultra Prevent
Wythenshawe Hospital - IKO Ultra Prevent and IKO Polimar EC/UV
Westminster Cathedral (Carbon Neutral) - IKO Permaphalt
Replacing the 55,000m2 Roof Area at Euston Station