NBS Source
List your products

IKO Permatrack Bridge Surfacing Saves Tower Bridge

by IKO PLC

  Favourite

The bridge was closed in September 2016 for three months while necessary repairs were made to the lifting sections, walkways and approaches.

Read more

No featured products in this case study

Contact IKO PLC by clicking the button below to find out which products were used in this case study.

More case studies from IKO PLC

View all case studies from IKO PLC (84)