The original profiled metal decking was covered with a layer of fibreboard and a layer of felt. Deterioration was so bad in places that entire areas of the roof needed replacing. Some areas were so fragile that it was dangerous for contractors to walk on them.
Starting from the less damaged areas of the roof, the original roofing was removed and replaced the profile metal deck with a spacer support system onto which was laid fibreboard and then the IKO Mach One system from IKO.