This case study is no longer available
Initial Situation: The hotel-s chimney had a large void above the fire opening which was unable to be cleaned. This was allowing repetitive chimney fires. Project Challenge: We were unable to open the chimney due to the hand painted murals to the bar area. Liner Chosen: FuranFlex25 RWV Result: FuranFlex chimney liner was the most suitable system maintaining the required cross-sectional area of 225mm and no requirement for opening up the chimney above the fireplace. Following the installation, the bar opened for evening trade.
Contact Kompozit'All UK by clicking the button below to find out which products were used in this case study.