NBS Source
I'm a manufacturer

Heated Z Lockers at BT Bristol

OVERVIEW

As a part of the development of the company, BT are planning to reduce their number of working locations from over 300 to just 30. BT Bristol features flexible workspaces, the latest IT and smart building technology, restaurants and cafes and a rooftop wildflower meadow terrace with panoramic views of Bristol.


An important aspect of the development of this new building was its eco credentials. With the whole company seeking to reduce its carbon emissions, choices were made throughout the design and build process to support this aim. As well as the rooftop meadow, the building features a heating system from the low-carbon district heating network and aspects that encourage employees to make greener choices about their travel to and from work. In order to support this, the BT Bristol office building features parking for around 270 bicycles, as well as changing rooms, showers and lockers.


Helmsman were excited to be contacted by Honeyfield Property Services to supply and install the lockers at BT Bristol. The client requested Heated Z Lockers, with hasp locks for the user to attach their own padlock.

Heated Lockers are a great addition to a cycle storage area, providing a storage solution that can dry damp clothes as well as keep your items safe during the working day.


The Z shape is a particularly good choice for heated lockers, as the user can hang their clothing in the taller area of the locker and let the heated locker do the hard work.

Air flows through the locker through a perforated base, and perforations at the top of the locker allow the damp air to escape. The tube heaters are positioned within the stands of the locker and can be either plugged into a 3-pin power socket or wired into a fused switch.


In keeping with BT Bristol’s aim for carbon efficiency, the laminate used for the project was Graphite by BioCarbon Laminates. This is one of Helmsman’s standard laminate options, and is a carbon neutral material.


In addition to the lockers, we also supplied and installed seat stands, with adjustable feet, and ash hardwood seat slats. The stands, back and sides of the lockers were all cladded with matching Graphite laminate, and the lockers were finished with black circle discs with white numbering.

It was great to work with Honeyfield Property Services on this project, and wish the BT Bristol office much success in the future.


If you have a similar project, or want to find out more about our Heated Lockers, give us a call on 01284 530427 or fill in our contact form here.

Products featured in this case study

View all products (26)
Heated Lockers

Heated Lockers

Locker Stands and Seat Stands

Locker Stands and Seat Stands

Z Lockers - Wet Area

Z Lockers - Wet Area

More inspiration from Helmsman

View inspiration
Isenhurst Health Club

Isenhurst Health Club

Reach Printing Services

Reach Printing Services

Staybridge Suite (Heathrow Airport) Lockers for Luggage & Bikes

Staybridge Suite (Heathrow Airport) Lockers for Luggage & Bikes

Eos Interiors Ltd Office Lockers Project

Eos Interiors Ltd Office Lockers Project

More inspiration from Lockers

View inspiration
Investment bank project, Lockers

Investment bank project, Lockers

Laminate Lockers & Z Lockers at 72 Welbeck Street, London

Laminate Lockers & Z Lockers at 72 Welbeck Street, London

Heated Lockers at the Innovation Hub, Production Park

Heated Lockers at the Innovation Hub, Production Park

Ipswich Town Football Club Project

Ipswich Town Football Club Project

More inspiration from Carbon steel frames

View inspiration
Investment bank project, Lockers

Investment bank project, Lockers

Ipswich Town Football Club Project

Ipswich Town Football Club Project

McCormick Staff & Visitor Lockers Project

McCormick Staff & Visitor Lockers Project

Heated Z Lockers at Four New Bailey

Heated Z Lockers at Four New Bailey