NBS Source
List your products

Hangzhou Olympic Sports Center

by Jotun Paints (Europe) Ltd

  Favourite

The Main Stadium at Qian Tang river front, opposite the city’s new Central Business District, is an impressive project with a complex structure. Chosen to be the main venue of the 2022 Asian Games, the main stadium covers an area of 210,110m2. In addition tothe 80,000-seat main stadium, the project also includes 10,000-seat tennis center, aquatic center, convention center, athletic facilities and retail. In the first construction phase alone, Jotun’s Performance Coatings were meticulously specified for coating the 18,000 tons of steel in the main stadium.

No featured products in this case study

Contact Jotun Paints (Europe) Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Jotun Paints (Europe) Ltd

View all case studies from Jotun Paints (Europe) Ltd (11)