NBS Source
I'm a manufacturer

Guernsey Power Station

OVERVIEW

The flat roof area at above the vast Guernsey Power Station had been suffering from water ingress as a result of failings in the existing EPDM membrane. Due to the expensive machinery housed within and the potential for widespread and costly disruption should the leaking continue.


Guernsey Electricity turned to Sarnian Roofing Limited, a Polyroof approved contractor, to provide a rapid and effective waterproofing solution. The Protec System was specified, and work began quickly.


The Solution


Removal of the failed roof coverings to expose the concrete deck below began, and the BBA-approved Protec 20-year system was installed directly to the concrete. Due to its RapidCure technology, the system cures within 30-60 minutes, meaning less disruption for the client.


The Protec System provides an flexible and seamless membrane that eliminates the risk of water ingress around penetration points common in industrial unit roofs. As the system is cold applied, there are none of the safety risks associated with the open flames and hot torches used with traditional roll-applied systems.

Polyroof’s reputation has been built on the high level of technical support provided to clients before, during and after every contract.


We like to work closely with our clients from the very beginning of a flat roofing project right through to completion and throughout the lifespan of the roof. From our experience, this is the best way to guarantee that all aspects of the roof are finished to the superior standards that our clients expect.


Products featured in this case study

View all products (6)
Protec Overlay Roof Systems - Cold-applied liquid waterproofing

Protec Overlay Roof Systems - Cold-applied liquid waterproofing

More case studies from Polyroof Products Ltd

View all case studies (31)
Fleming Park Leisure Centre

Fleming Park Leisure Centre

Durham University Gateway

Durham University Gateway

Barton Hill Academy

Barton Hill Academy

Blackfordby St Margaret’s Primary School

Blackfordby St Margaret’s Primary School

More case studies from Liquid-applied cold roof covering systems

View all case studies (28)
Fleming Park Leisure Centre

Fleming Park Leisure Centre

Durham University Gateway

Durham University Gateway

Barton Hill Academy

Barton Hill Academy

Blackfordby St Margaret’s Primary School

Blackfordby St Margaret’s Primary School