NBS Source
I'm a manufacturer

Greenwich Village

OVERVIEW

The Challenge

The Greenwich Village scheme completes the masterplan for the Greenwich Millennium Village development, generating a complex and picturesque arrangement of buildings defined by streets and squares and providing 1,746 homes. The build had to provide a complementary interpretation of an earlier build designed during the 1990s. The largest regeneration project of its kind in London, the challenge was to achieve a holistic, long-term scheme.


The Solution

With a strong focus on street life, the project concept incorporated a mixture of townhouses and apartments in lower-rise buildings of between three and five storeys.

Traditional street patterns with narrow mews ensured compatibility with the design of the previous phases but also allowed for some individuality in the new phase. The project strategy centred on the technical and acoustic challenges of the project whilst also recognising the need to provide a sustainable environment.


The Benefits

The build achieved the required density while in keeping with the character of the Village. Forterra’s Dark Moroccan Smooth Butterley Brick was used to provide the desired aesthetics and subtleness for the build whilst also establishing its own identity.

No featured products in this case study

Contact Forterra Building Products by clicking the button below to find out which products were used in this case study.

More case studies from Forterra Building Products

View all case studies (45)
Palatine Homes

Palatine Homes

Norfolk House Phase 2

Norfolk House Phase 2

Yoko Ono Lennon Centre

Yoko Ono Lennon Centre

Rye Lane

Rye Lane