NBS Source
I'm a manufacturer

Great West House

OVERVIEW

Sherwin-Williams, one of the world’s largest manufacturers of powder coatings, has helped transform London’s skyline with a stunning new look guaranteed to last for decades.


The multimillion pound refurbishment of Great West House in Brentford – one of the capital’s landmarks – demanded a finish that had guaranteed reliability and matched the bold ambitions of its owners, CLS.


Market-leading Syntha Pulvin coatings from Sherwin-Williams had a proven track record on the UK’s most prestigious developments, with a 30-year guarantee – making it the obvious choice for the Great West House’s refurbishment. Powdertech (Bicester), a Sherwin-Williams approved applicator, applied nearly 4.5 tons of Syntha Pulvin powder coatings in silver metallic to the two-building development (named GW1 and GW2), covering every inch of its metalwork.


“This was a particularly large and impressive job, but it’s the kind of complex, intricate powder coating work that we specialise in,” said Peter Hudson, Commercial Manager, Powdertech (Bicester). “The Sherwin-Williams Syntha Pulvin coating is one of the prime products in the market and we use it on almost every project, as the coating’s inherent quality and long guarantee appeals to our prestigious clients.”


These powder coatings are 100% recyclable and can be applied to aluminum and galvanised steel window frames, cladding panels, curtain walling, roofing and most architectural metalwork. All products are fully weather resistant, prevent UV fade and offer thermal shock resistance. The Syntha Pulvin matte coating’s durability was also successfully tested in Florida for five years – the equivalent to more than 30 years in Northern Europe.


Project Details

  • Client: CLS
  • Contractor: Powdertech (Bicester)
  • Coatings Provider: Sherwin-Williams
  • Products: Silver Metallic Syntha Pulvin Powder Coating


Products featured in this case study

View all products (8)
Syntha Pulvin - Polyester Powder Coating

Syntha Pulvin - Polyester Powder Coating

More case studies from Sherwin-Williams General Industrial

View all case studies (15)
SYNTHA PULVIN CASE STUDY
ECHO 24 – SUNDERLAND, ENGLAND, UK

SYNTHA PULVIN CASE STUDY ECHO 24 – SUNDERLAND, ENGLAND, UK

SYNTHA PULVIN CASE STUDY
GREAT WEST HOUSE – BRENTFORD, UK

SYNTHA PULVIN CASE STUDY GREAT WEST HOUSE – BRENTFORD, UK

SYNTHA PULVIN CASE STUDY
SPINNAKER TOWER – PORTSMOUTH, UK

SYNTHA PULVIN CASE STUDY SPINNAKER TOWER – PORTSMOUTH, UK

Citadel Bridge Hamburg, Germany

Citadel Bridge Hamburg, Germany

More case studies from Powder coatings

View all case studies (23)
Wood finish solar shading on aluminium

Wood finish solar shading on aluminium

Evolution gold façade, Covent garden

Evolution gold façade, Covent garden

Blackhorse Mills, Walthamstow. Terracotta feature facade

Blackhorse Mills, Walthamstow. Terracotta feature facade

Rusty Barn roof

Rusty Barn roof