Set within Borough Market, London this project required us to design, supply and install a large 2000kg Goods Only Goodsmover lift.
Contact Shorts Industries Ltd (Shorts Lifts) by clicking the button below to find out which products were used in this case study.
Automatic Dumbwaiter Service Lifts - Halo Building, London
Passenger Lift with Shallow Pit - Grand Theatre, Leeds