A Gloucestershire based independent care provider has recently completed a 46 bed extension on their care home for clients with dementia and nursing care requirements. Having worked with the contractor on a similar project, Astor Bannerman were recommended to the company to supply ceiling track hoists in an effort to future proof the needs of the home. 


With floor space at a premium, the company wanted to move away from the traditional style mobile hoists, which need to be stored away when not in use. Also, as using a ceiling hoist system normally only requires one carer to operate, this enables the company to adapt to the possible implications of Brexit on staffing levels.


During the installation, we successfully added an XY (H-frame) hoist system into 3 assisted bathrooms and added 3m straight track OT200 hoists in 6 bedrooms allowing simple transfer in an out of bed.


Fixings were also installed during the main build in the remaining 40 bedrooms, enabling the care provider to retrofit track and hoists as and when they require them at any point in the future.

Products featured in this case study

View all products (19)
Astor OT200 Ceiling Track Hoist

Astor OT200 Ceiling Track Hoist

More case studies from Astor Bannerman

View all case studies (22)
Wimbledon Tennis Installs Changing Places Rooms

Wimbledon Tennis Installs Changing Places Rooms

Wisley - Made Possible by Changing Places Toilets

Wisley - Made Possible by Changing Places Toilets

Hoists in Changing Places Toilets: Top 4 Considerations

Hoists in Changing Places Toilets: Top 4 Considerations

Leeds Royal Armouries Officially Opens New Changing Places Toilet

Leeds Royal Armouries Officially Opens New Changing Places Toilet

More case studies from Assisted transfer hoists

View all case studies (2)
St Andrew's Hospice

St Andrew's Hospice

Dr Kershaw's Hospice Integralift Bed Hoists

Dr Kershaw's Hospice Integralift Bed Hoists