NBS Source
List your products

Case study no longer available -

Furanflex Heritage Chimney lining in North Yorkshire

by Kompozit'All UK

  Favourite

Specialist Chimney Services was called out to Lartington Hall. The existing marble fireplace needed to be made operational. It was decided that Furanflex-25 would be the most practical solution in maintaining the flue diameter within the chimney stack due to FuranFlex-25 liners being thin and mouldable. The chimney length was 12 metres tapering towards the top. The existing chimney already had a steel liner installed however this was damaged. FuranFlex-25’s unique installation method meant it was able to expand from within and there was no need to destroy walls to remove the old liner.

Read more

No featured products in this case study

Contact Kompozit'All UK by clicking the button below to find out which products were used in this case study.