Sertus were commissioned to provide products that would help mitigate heat build-up within the common areas of the building.


  • Project Name: Fulneck Place
  • Location: London
  • Sector: Residential
  • Client: Breyer Group


Initial Brief:

When the building was originally constructed, there was a natural smoke control system. However, due to very efficient insulation and a communal boiler, the building was becoming exceptionally warm, with corridors sitting between 40 and 50 degrees celsius.

Sertus were called on to supply industry leading products, which would stop the heat build-up issues.


Outcome:

Sertus supplied, mechanical pods, roof single leaf vents and roof vent collars to this project. View these products here.

Products featured in this case study

View all products (9)
Roof Environmental Ventilation Collar

Roof Environmental Ventilation Collar

Mechanical Extract Fan Pod for Smoke Shafts

Mechanical Extract Fan Pod for Smoke Shafts

More case studies from Sertus

View all case studies (11)
Sudbury House

Sudbury House

Lily's Walk

Lily's Walk

Grafton Quarter

Grafton Quarter

LIV Student Accomodation

LIV Student Accomodation

More case studies from Powered smoke and heat exhaust ventilators

View all case studies (3)
Barking Wharf

Barking Wharf

Moxy Hotel

Moxy Hotel