NBS Source
List your products

Forth Road Bridge

by Briggs Amasco Ltd

  Favourite

BriggsAmasco is one of the very few companies with the capacity to provide up to twenty directly employed skilled asphalters for a project of this size. Re-surfacing the southbound main span of this famous suspension bridge, working only at weekends, the asphalt was laid in bays by hand to a thickness of 38mm, the material being delivered directly to site in thermostatically controlled hot charge vehicles by Permanite.

Read more

No featured products in this case study

Contact Briggs Amasco Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Briggs Amasco Ltd

View all case studies from Briggs Amasco Ltd (87)