by IKO PLC
This project had a wide ranging number of detailing factors to overcome with cladding abutment details and change in levels to be redesigned and encompassed into a system that also drained the roof areas of their historic high levels of standing water. Some of the existing construction build had not taken into account any suitable maintenance of the roof with sections being completely inaccessible and thus reducing the performance of the waterproofing.
Contact IKO PLC by clicking the button below to find out which products were used in this case study.
Portslade Academy - IKO Ultra Prevent
Wythenshawe Hospital - IKO Ultra Prevent and IKO Polimar EC/UV
Westminster Cathedral (Carbon Neutral) - IKO Permaphalt
Replacing the 55,000m2 Roof Area at Euston Station