NBS Source
I'm a manufacturer
This case study is no longer available.

First Way Campus Student Accommodation, Wembley Park

Viewing archived case study data

This case study has been archived and is no longer valid.

More inspiration from Promat UK

View inspiration
Manchester Airport Case Study - PROMAT DURASTEEL to create 60-minute fire-rated ceiling

Manchester Airport Case Study - PROMAT DURASTEEL to create 60-minute fire-rated ceiling

Stronelairg Wind Farm Case Study - Promat, Duratseel

Stronelairg Wind Farm Case Study - Promat, Duratseel

First Way Campus Student Accommodation, Wembley Park Case Study - Promat

First Way Campus Student Accommodation, Wembley Park Case Study - Promat

The role of vacuum insulated panels (VIP) in FHS’s ‘world-leading energy efficiency’ goal

The role of vacuum insulated panels (VIP) in FHS’s ‘world-leading energy efficiency’ goal