NBS Source
List your products

First Point, Gatwick

by AET Flexible Space

  Favourite

Originally completed in 1998, UfAC was specified for this new build development after the developer carried out a feasibility study, comparing underfloor against ceiling based air conditioning. Compared with a near identical building the developers were able to demonstrate a 2m total reduction in building height. They calculated that 25% more floor area is available using the underfloor system and savings in construction time were around five weeks. AET returned to First Point in 2015 to carry out system upgrades.

Read more

No featured products in this case study

Contact AET Flexible Space by clicking the button below to find out which products were used in this case study.

More case studies from AET Flexible Space

View all case studies from AET Flexible Space (64)