OVERVIEW
An 18 month long fit-out contract for a Tewkesbury based cladding specialist has seen the company install thousands of square metres of FIREFLY® barriers, to protect the roof space and other voids within a major new food processing plant in the Manchester area.
Cold Clad Ltd. was appointed by the main contractor to install all of the internal wall panels, suspended ceilings and the kerbing, as well as carrying out the installation of the vertical fire protection barriers using Titan Lite™ 120:60 and Collaroll, which were secured across light gauge steel subframes to provide two hours integrity and 60 minutes insulation. Aligning with the nearest roof purlin to secure the frames assembled from 50 x 50mm steel angles, Cold Clad created barriers ranging in height from three metres down to less than one metre. While also accommodating the movement requirement of the large metal structure.
Cold Clad’s Contract Manager for the project, Ross Camberley, commented: “The scale of the installation meant we had up to 30 operatives involved on the work for most of the period, many of whom had undergone the training course delivered by FIREFLY®, which I also took in order to be able to understand the complexities of erecting the ‘triple curtain’, and also protect all of the penetrations such as steel beams and building services. While this was a very challenging project due to the scale of the work – and also my first experience of the FIREFLY® range – we are about to carry out another contract in Holyhead for a different client and will actually be using another of the manufacturer’s approved installers to do the work.”
FIREFLY® Titan Lite™ 120:60 is a lightweight flexible fire barrier designed to provide fire compartmentation of larger concealed spaces and voids within buildings, offering 120 minutes Integrity and 60 minutes insulation. Manufactured from woven and non-woven glass, the FIREFLY® range is designed to optimise resistance to flame and smoke, as well as offer heat protection in a wide range of scenarios. The certified barriers are easy to install horizontally or vertically using a full selection of FIREFLY® ancillary products to ensure a fully tested and certified installed system.
Contact FIREFLY™ TBA by clicking the button below to find out which products were used in this case study.
Hyde Park property protected using FIREFLY™ ZEUS Lite™ Barrier
FIREFLY™ TITAN Lite™ Protecting Movement Joints Within New Midland Metropolitan University Hospital.
Preston Medical Facility Safe Beneath FIREFLY™ APOLLO Lite™ Fire Barriers
FIREFLY™ APOLLO Lite™ 30:30 Fire Barriers Upgrade Protection for West Lothian Commercial Property