OVERVIEW
Built in 1986, Dukes Court was viewed as a symbol of Woking’s economic growth, offering 220,000 sq. ft. of premium office accommodation. These works will ensure Dukes Court continues to play an important role in the town’s future.
The front of Dukes Court underwent an extensive remodelling, creating a landscaped pedestrianised public plaza and restaurant with outdoor seating.
The building features an impressive full height living ‘green’ wall, which is one of the tallest in Europe. The building is arranged over five blocks which are accessed via three separate reception areas, leading to the flexible floor plates which all benefit from excellent natural light.
Other features include:
Granite from around the world (mainly the far east) included BBS Steel (mid grey) granite, Haze (silver grey) granite, Barzan (black) basalt, and Peppercorn (pink) granite.
Contact BBS Brick and Stone Limited by clicking the button below to find out which products were used in this case study.
Windsor Castle
Coventry Shopping Precinct - City of Culture 2021
Maidenhead Town Centre
New Bailey - Manchester