OVERVIEW
We were approached to help design the support system for two new district heating pipelines running under a newly constructed bridge spanning the River Avon.
There were several complexities on this project including the heavy pipework, pipe expansion, corrosive environment and vibrations.
Vibratek® HS-1 Spring Hanger
HD500 - Heavy Duty Clamp - Unlined (M16)
HD500 - Heavy Duty Pipe Clamp Unlined - (M8/10 - M10/12)
Heavy Duty Stainless Steel Pipe Clamp
Stainless Steel Heavy Duty - Pipe Clamp with Lining
HD1501 - Heavy Duty Clamp with Lining - M16
Walraven Expansion Device
Case study - Walraven concrete screws
Case study - Walraven Pacifyre Fire Sleeve on The Shard
Case Study - Walraven Yeti feet in use on new Everton Stadium build
Case study - Walraven RapidRail light strut system
Theater aan de Parade
9 Marylebone Lane
Case study - Walraven RapidRail light strut system