by IKO PLC
In 2014 discussions took place between IKO and Surveyors for the property, over the possibility of renewing the mastic asphalt roof coverings with an IKO Permaphalt Polymer Modified Mastic Asphalt System. During 2015 this process took place with the work being undertaken by Survey Roofing, one of IKO’s Approved Contractors. During the works some 50 tonne of IKO Permaphalt was installed and due to IKO’s commitment of supplying Carbon Neutral Mastic Asphalt we are able to calculate the impact this has on the population.
Contact IKO PLC by clicking the button below to find out which products were used in this case study.
Portslade Academy - IKO Ultra Prevent
Wythenshawe Hospital - IKO Ultra Prevent and IKO Polimar EC/UV
Westminster Cathedral (Carbon Neutral) - IKO Permaphalt
Replacing the 55,000m2 Roof Area at Euston Station