OVERVIEW
MOY worked closely with the design management team and co-ordinating suppliers to ensure that any roof penetrations and projecting detailing areas were understood and approved prior to the installation of the roof system. The programme was carefully studied to ensure system components were installed to offer greater benefit to the project and internal areas. Some of the challenges faced on this project were the steels that dissected the roof deck allowing plant and walkways to be supported and the detailing requirement saw a cold liquid waterproofing to compliment the Reinforced Bitumen Membrane.
MOY Paraflex Reinforced Bitumen System - Waterproofing Membranes
WITHINGTON GOLF CLUB * MOY LIQUID SYSTEM
Canonmills Garden MOY Paro-Melt Hot Melt System
JUSTICE & REFORM SECTOR: HOT MELT USING MOY PARO-MELT
Mission Critical Green Roof
1820m2 School Roof Refurbishment - St Edmunds Catholic Academy - IKO ULTRA Prevent 25
2000m2 School Roof Refurbishment - Torpoint Community College – IKO ULTRA Prevent 25
Residence benefit from a flame-free roof installation
CS_Pro-Felt_High Street, Polegate