OVERVIEW
The Lindner Group played an important role in the revitalisation of the fifth, sixth and seventh floor with their divisions ceiling and walls.
Focus of the remodelling was the arrangement of various small and mediumsized conference rooms: sound-insulated glass and metal partition walls provide the necessary division and acoustics and form a transparent and open finish to the front towards the hallways.
Round glass elements in the partition walls are an additional eye-catcher while elegant wooden and glass doors underline the design.
Thanks to the installation canopy and heated and chilled ceilings in slat optics, efficient temperature management inside the building is also ensured.
Completed Works
Double Glazed - No Fire Rating - Double glazed modular partition
Expanded Metal Ceilings
Solid Double - No Fire Rating - Solid partition
Projektreport Allerhuset Denmark
Maxwell Centre, University of Cambridge
John Lewis Oxford Street
Wembley Stadium
cGMP Advanced Manufacturing Area for Orthoplastics
Compound Semiconductor Innovation Centre for CSA Catapult
The Compound Semiconductor Facility for IQE
cGMP Global Packing Centre for AstraZeneca
The Compound Semiconductor Facility for IQE
The Rounhouse for Derby College
Ray Dolby Centre for Cambridge University's Physics Department
London Bridge Station (Network Rail)