NBS Source
I'm a manufacturer

This case study is no longer available.

Aldgate Place, E1

OVERVIEW

Barratt Homes' stunning London apartments at Aldgate Place, E1 required the installation of wetrooms onto screeded floors.Linear Wall Drains and Stone-Infill Grills were specified into the apartments and penthouses within the high rise complex.To comply with planning regulations for apartment blocks, a same level waste connection was required within the 100mm floor build up of each of the wetrooms. This was achieved using the shallow linear wall drain which has a total height of only 67mm. RIW Tilesafe waterproof membrane and RIW FWM were applied to the floor and walls to prevent water penetration.

No featured products in this case study

Contact CCL Building Products Ltd by clicking the button below to find out which products were used in this case study.