NBS Source
I'm a manufacturer

ACO’s surface to outlet drainage solution delivers cost savings at new teaching facility.

OVERVIEW

The new Abraham Darby Academy was developed as part of Telford’s Building Schools for the Future scheme. It is a state-of-the-art teaching facility, designed for the 21st century, for pupils aged from 4 to 18, with a new primary school and leisure facility on the site. The Academy provides teaching space for 1,100 students, plus a sixth form facility, and the primary school can accommodate 400 pupils. The leisure centre includes a swimming pool, a four-court sports hall, fitness suite and changing facilities.

No featured products in this case study

Contact ACO Technologies plc by clicking the button below to find out which products were used in this case study.

More case studies from ACO Technologies plc

View all case studies (26)
ACO StormBrixx plays its part in new Academy’s SuDS design for exceedance

ACO StormBrixx plays its part in new Academy’s SuDS design for exceedance

Handcrafted drainage for craft beer brewer

Handcrafted drainage for craft beer brewer

ACO combined kerb drainage system installed throughout widening of A453

ACO combined kerb drainage system installed throughout widening of A453

Welsh Housebuilder turns to ACO StormBrixx for access

Welsh Housebuilder turns to ACO StormBrixx for access