OVERVIEW
We had originally worked with Middlesbrough Council to complete Abingdon Primary School’s first phase of the roofing in 2015, and were asked to review the remaining flat roof areas to bring them in line with the previous phase.
Excel® FM Warm Roof Mechanically Fixed Single Layer System - Timber Roof Deck/ Profiled Metal Deck
Excel® FM Warm Roof Flame Free Mechanically Fixed Single Layer System - Timber Roof Deck / Profile Metal Deck
Excel® Warm Roof Multi Layer System - Concrete Roof Slab (In-situ/ Pre-cast) / Timber Roof Deck / Profiled Metal Deck
Excel Warm Roof Single Layer System - Concrete Roof Slab (In-situ/ Pre-cast) / Timber Roof Deck / Profiled Metal Deck