NBS Source
I'm a manufacturer

55 Whitehall, London - Knauf Hugo18 - Overlay to existing Raised Access Floor

OVERVIEW

55 Whitehall was previously a Government occupied office space. This iconic building has undergone a complete re-design. There was existing steel encapsulated raised access flooring throughout. Rather than remove or replace the raised floor, it was retained.

Hugo18 was specified here to use as an overlay solution to the raised access floor. It offers a non-combustible, high performance substrate for a range of finishes, in this case - ceramics

Products featured in this case study

View all products (7)
Overlay to Raised Access Floor - Knauf Dry Screed Panel

Overlay to Raised Access Floor - Knauf Dry Screed Panel

More case studies from Access Floors Distribution

View all case studies (6)
Overlay to Raised Access Floor - Knauf GifaFloor FHB18

Overlay to Raised Access Floor - Knauf GifaFloor FHB18

Tour Alto, La Défense, Paris - Knauf DB Green Raised Floor System

Tour Alto, La Défense, Paris - Knauf DB Green Raised Floor System

Terrazzo Raised Floor System – Cottam House, Kings Cross, London

Terrazzo Raised Floor System – Cottam House, Kings Cross, London

Nova N2 Development - London - Modular Washrooms

Nova N2 Development - London - Modular Washrooms

More case studies from Raised access floor panels

View all case studies (4)
Bloomberg

Bloomberg

British Sugar

British Sugar

Overlay to Raised Access Floor - Knauf GifaFloor FHB18

Overlay to Raised Access Floor - Knauf GifaFloor FHB18