Wincanton Primary School, Wincanton

OVERVIEW

REQUIREMENT: Replacing a worn-out wooden ramp with a compliant Rapid Ramp System.


The system had to be strong enough to withstand impact from electrically operated wheelchairs, support users in the case of a fall and have handrails that confirm with BS 6180: 2011. Our ramp achieves all these requirements.


Plus, the steel components of the Rapid Ramp System are zinc coated, and hot dip galvanized in accordance with BS EN ISO 14713-2:2020.

All ramp handrails and guardings are powder-coated to BS EN 12206-1:2004.


END RESULT:

 Once the wooden ramp was dismantled, the Rapid Ramp system was fitted.

The ramp was fully installed by the end of day one, and day two was spent evenly distributing the rubber crumb over the walkway surface.


FEATURES INCLUDED:

  •  Infill Handrail - this product prevents users from climbing or falling through gaps.
  • Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp. Additionally, it helps users distinguish any level changes.
  • Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.
  • Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.
  • Rest Platform – a rest platform at 5 metres is required to allow the user to pause.
  • 1100mm High Rail – these handrails attach to any level sections.
  • Continuous Handrail - this handrail system ensures users always have support to hold onto.


EXTRA FEATURES INCLUDED:

  • Underside Mesh Hoarding - this mesh is designed to prevent children from gaining access to the underneath of the ramp.
  • Safetread Rubber Surface - this is a soft, slip-resistant surface that reduces the impact of falls. The product is made from the same materials used in soft play areas and is ideal for nurseries, schools, and public facilities. Plus, it is available in a range of colours and will continue to perform in all weather conditions.


Products featured in this case study

View all products (7)
Fully Compliant DDA Modular Ramp

Fully Compliant DDA Modular Ramp

Modular Walkway Platform

Modular Walkway Platform

More case studies from Rapid Ramp Limited

View all case studies (20)
Hathersage Road Car Park, Manchester Royal Infirmary

Hathersage Road Car Park, Manchester Royal Infirmary

Carlisle Park Pavilion Cafe, Morpeth

Carlisle Park Pavilion Cafe, Morpeth

Holy Cross Preparatory School, Kingston upon Thames

Holy Cross Preparatory School, Kingston upon Thames

Euston Station, London

Euston Station, London

More case studies from Working platform and walkway systems

View all case studies (7)
Retail Store - Staines Upon Thames

Retail Store - Staines Upon Thames

Retail Store, Sheffield.

Retail Store, Sheffield.

New Facebook Data Centre. Ireland

New Facebook Data Centre. Ireland

Palmarsh Primary School, Hythe

Palmarsh Primary School, Hythe

More case studies from Heavy steel stair systems

View all case studies (2)
Lincoln Cathedral, Lincoln

Lincoln Cathedral, Lincoln

Palmarsh Primary School, Hythe

Palmarsh Primary School, Hythe