OVERVIEW

With capacity for almost 4,000 guests and 96 percent occupancy, Longleat Center Parcs had to make sure there was absolutely no disruption for its guests during the refurbishment of its Subtropical Swimming Paradise. Two distinct solutions were proposed – a mechanically fastened system using Sarnafil S327-18EL for the dry side and an adhered system using Sarnafil G410-18EL for the more humid area. Both were specified in Patina Green to blend with the natural environment.