NBS Source
I'm a manufacturer

This case study is no longer available.

3M DI NOC Revitalise Washed Out Bathrooms

OVERVIEW

The washed-out bathrooms of a busy office block have been given a fresh lease of life thanks to 3M DI NOC Architectural Films. Ideal for refreshing and refurbishing buildings, DI-NOC finishes have been used to update a five-storey shared office block washrooms, in a major refurbishment programme implemented by Portsmouth-based Wrapt. Developed by 3M as a cost-effective design solution for interior and exterior new building construction and/or refurbishment projects, 400 metres of DI-NOC was required for the project, to transform the out of date, tired looking, washrooms with minimal disruption for the tenants.

No featured products in this case study

Contact Architextural by clicking the button below to find out which products were used in this case study.