DHL Supply Chain, Barming Depot in Aylesford

OVERVIEW

210 Metres of Unifold Gutters was installed at the DHL Supply Chain, Barming Depot in Aylesford.

Installed by Blenheim Roofing, the project was a full strip & re-sheet of an asbestos cement roof.

During initial surveys it was discovered that historically, the existing asbestos gutters were prone to leaks and overflow issues into the building.

Unifold was not only used to line the gutters to cure the leaks but also increase the capacity.

Products featured in this case study

View all products (2)
Unifold Gutter Lining System

Unifold Gutter Lining System

More case studies from Ampteam Ltd

View all case studies (4)
Argos Distribution Centre, Castlegate, Wolverhampton

Argos Distribution Centre, Castlegate, Wolverhampton

Exxon Mobile

Exxon Mobile

HM Land Registry

HM Land Registry

More case studies from Gutter linings

View all case studies (4)
First Bus Depot, Manchester

First Bus Depot, Manchester

Fortec Distribution Network, Daventry

Fortec Distribution Network, Daventry

Metal Roof and Gutter Coating - Well Lane, Wolverhampton

Metal Roof and Gutter Coating - Well Lane, Wolverhampton

Solihull - Metal Gutter Coating

Solihull - Metal Gutter Coating