Triton Systems approved contractor, British Damp Proofing, installed products supplied by Triton Systems to waterproof two lift shafts in a development of 25 dwellings. Triton Bentonite Membrane was used to waterproof the lift slab base and kicker, which were poured using concrete made waterproof with Triton TT Admix. Triton's Adcor waterbar was then installed on to the kicker.
Contact Triton Systems by clicking the button below to find out which products were used in this case study.
Britain's biggest domestic basement?
ICF Waterproofing case study: Structural waterproofing products from Triton Systems have been specified for one of the largest ICF construction dwellings ever built in the UK.
Triton Supplies Type C Waterproofing For Landmark London Scheme
TT Admix Specified For Major New Build Construction