Project Overview
Bedford Academy’s two-storey extension, delivered by Ashe Construction for Bedford Borough Council and designed by GSS Architecture, required Passive House-grade airtightness to meet Net Zero Carbon in Operation standards. The scheme included 16 classrooms, changing rooms, dining facilities, a community café, and flexible multi-use spaces for community use.
Project Goals
- Achieve airtightness well beyond standard Building Regulations
- Ensure continuity of the vapour control layer across multiple substrates (masonry, steel, OSB, plasterboard)
- Integrate airtightness measures with high-performance insulation, MVHR, ASHP, and solar PV systems
- Deliver long-term durability for a high-traffic educational environment
System Components
- IMAF Tape (Intelligent Membranes Airtight Fleece) – Used to bridge large gaps and seal challenging junctions between different materials, including wall-to-roof and window reveals. Applied in multiple widths (75mm–200mm).
- Passive Purple Brush – Fibre-reinforced liquid membrane for detailed, high-risk areas (pipe penetrations, beam ends, floor-to-wall, wall-to-steel, OSB joints, fixings).
- Passive Purple Internal – Spray- or roller-applied airtight and vapour control membrane to the warm side of the external walls, creating a seamless airtight layer.
- Waterproof Blue Liquid DPM – Applied in moisture-prone areas and under door linings for additional vapour and damp control.
- Airtight Grommets – Used for cables and pipe penetrations, ensuring repeatable and verifiable airtight seals.
Performance Achieved
- Airtightness: 0.43 ACH@50Pa (Passive House levels)
- Vapour Control: Continuous and integrated with airtightness layer
- Durability: Long-term resistance to environmental factors, maintaining performance for the lifespan of the building
- Energy Efficiency: Significant reduction in heating/cooling loads, supporting Net Zero operation
Installation Methodology
- Surface preparation – Substrates cleaned and primed where necessary.
- Moisture protection – Waterproof Blue Liquid DPM applied in damp-prone zones.
- Junction sealing – IMAF Tape installed at all critical interfaces.
- Detailing – Passive Purple Brush applied to penetrations and irregular surfaces.
- Full coverage – Passive Purple Internal sprayed or rolled to create a seamless airtight membrane.
- Penetration sealing – Airtight Grommets fitted to cables and pipes.