Capital Docks, Dublin

OVERVIEW

Capital Dock, a 22-storey mixed use

development, including office blocks

and residential areas, is in the vibrant

Dublin Docklands and was developed by

Kennedy Wilson.


John Sisk & Son were the main 

contractors, and Clarke Contracts 

installed 25,000m² of Cemfloor, the 

chosen screed for the project.


The main advantage Cemfloor has over the flowing screeds is the quicker drying time. It also eliminates any risk of incompatibility with cement-based adhesives and levellers and no special preparations are needed before hand. After looking at their options, Cemfloor was chosen for the project due to its faster installation time and drying time compared to traditional sand and cement screeds. This helped to keep the project on track with its tight building schedule.


Due to its flowing nature, Cemfloor was pumped and placed 20 stories high without issue. The limited space available on site was also a factor to be considered and was resolved by using Cemfloor. It was delivered to the site ready mixed which eliminated the need of on-site mixing and storage of sand and cement on site.


Products featured in this case study

View all products (9)
Cemfloor  CT C20F4 - Liquid Screed

Cemfloor CT C20F4 - Liquid Screed

Cemfloor CT C25F5 - Liquid Screed

Cemfloor CT C25F5 - Liquid Screed

Cemfloor CT C30F6 - Liquid Screed

Cemfloor CT C30F6 - Liquid Screed

More case studies from Cemfloor Liquid Screeds

View all case studies (16)
Devenish College, Enniskillen

Devenish College, Enniskillen

Randox Laboratories

Randox Laboratories

Ballymore Royal Wharf

Ballymore Royal Wharf

Oval Village, Kennington, North London

Oval Village, Kennington, North London

More case studies from Ready-mixed levelling and wearing screeds

View all case studies (5)
EcoWorld Brentford

EcoWorld Brentford

Lululemon - Vancouver, Canada

Lululemon - Vancouver, Canada

Saxton Lane

Saxton Lane

Niles Bakery, St Austell

Niles Bakery, St Austell